At the job site a backhoe is used to excavate the existing stone walkway. Wood is used to create form walls to contain the poured concrete. Ready mix concrete is poured at the job site. Concrete is screeded. A color hardener is applied prior to stamping. The color hardener is smoothed with a bull float.